- Last Updated On: August 30, 2024
Mumbai Metro Line 4A – Green Line (Kasarvadavali – Gaimukh) metro corridor is 2.88 KM fully Elevated and consists 2 stations from Kasaravadavali – Gaimukh.
Metro corridor 4A is an extension of the Metro line 4 plan. Initially, Metro line 4 was planned to run the metro line between Wadala and Kasarvadavali. Later, the state government decided to extend the metro line until Gaimukh.
Indeed, the government had the plan to connect Gaimukh into a transport hub such that the commuters could easily connect to Thane, Mira-Bhayander, and Kalyan on the planned metro line stretch.
Moreover, demand from these areas is more, and presently commuters rely only on road connectivity. The official colour for the metro route stretch for metro lines 4, 4A, and 10 is Green and is called Mumbai Metro Green Line.
The Metro Line 4A is expected to bring additional ridership of about 1.5 lakh to 8.7 lakh commuters for the Wadala- Kasaravadavali Metro-4 corridor.
After successfully implementing the metro green line and red line, Residents from the Western suburbs, Thane, Kalyan, and other suburbs can reach their respective destinations without switching to different transportation modes.
Mumbai Metro Line 4A (Kasarvadavali – Gaimukh) Stations
Below is the list of stations on Mumbai Metro Line 4A i.e., Kasarvadavali – Gaimukh metro corridor. There are a total of 2 stations on the line, which are fully elevated.
# | Station Name | Status | Type | Connections |
---|---|---|---|---|
1 | Kasarvadavali | Under Construction | Elevated | Interconnect Mumbai Metro Line 4 – Green Line“ |
2 | Gowniwada | Under Construction | Elevated | – “ |
3 | Gaimukh | Under Construction | Elevated | Mumbai Metro Line 10 – Green Line |
Mumbai Metro Line 4A Route Map (Under Construction Line)
Project History and Other Details
The Detailed Project Report (DPR) was approved by Maharashtra Former Chief Minister Devendra Fadnavis at the 144th Mumbai Metropolitan Region Development Authority (MMRDA) meeting.
Chief Minister Devendra Fadnavis was also the chairman of the MMRDA. On 27th December 2018, the Maharashtra government approved the extension of Mumbai Metro line 4, which extends from Kasarvadavali to Gaimukh, implemented as Metro Line 4A (Green Line).
MMRDA awarded the contract for Metro 4A to J Kumar. The project is estimated to be completed by March 2022. The estimated cost for the extension for Metro lines 4A is ₹949 Crore.
The Metro Line – 4A (Green Line) route covers 2 stations which are Gowniwada and Gaimukh.
Project/Metro Name: Kasaravadavali – Gaimukh Metro Corridor
Line Number: 4A
Official Line Color: Green
Status: Under Construction
Distance: 2.88 km
Total Stations: 2 Stations
Depot: Mogharpada (20 hectares)
Operator: Mumbai Metropolitan Region Development Authority (MMRDA)
Project Started: 2019
Project Completion: Expected to be completed by 2022
Estimated Cost: ₹949 Crore
Detailed Project Report (DPR): View Here
Daily Estimated Ridership: 8.70 lakhs/day by 2021 and 12.13 lakhs/day by 2031. (Projection of Metro Line 4)
Metro Timings: –
Metro Fare: –
Track length: 2.88km
Track Type: Elevated
Metro Type: Rapid Transit
Number of tracks: 2
Operating Speed: 80km/hr (50mph)
Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification: Overhead 25 kV AC
Timeline Mumbai Metro - Line 4A (Green Line)
Timelines Coming Soon