The Mumbai Rail Development Corporation (MRVC) has begun work on two new car sheds to handle suburban trains in the Mumbai Metropolitan Region (MMR). Both the Western Railway (WR) in Vangaon and the Central Railway (CR) in Bhivpuri are constructing car sheds. The total cost of the project is INR 2352.77 crore.
The project has been authorized to meet Mumbai’s rising need for suburban rail maintenance. The two additional car barns are scheduled to be completed in December 2025. For train inspection, which is now done manually, the new car sheds will contain cutting-edge equipment and high-tech sensors.
The new vehicle shelters, according to authorities, will be able to accommodate up to 65 automobiles at a time. This would assist to minimize the time necessary for train maintenance and repair, thus improving the operating efficiency of Mumbai’s suburban rail network.
The new vehicle barns will also reduce stress on the existing auto sheds. Every day, more than 250 local trains are inspected and maintained at the six car sheds of Mumbai’s suburban network. The construction of two additional vehicle sheds will help to distribute workload and ease strain on the existing car barns.
The new car sheds will have modern facilities like as automated train washing machines, automatic coach cleaning machines, and other cutting-edge technologies. The employment of high-tech sensors for train inspection will help in the discovery of defects in the trains in a timely and exact manner. This will assist to shorten the time necessary for train repairs and maintenance.
The installation of the new car shelters will also provide work opportunities for local inhabitants. The MRVC has mandated that contractors utilize local workers to construct the new vehicle shelters. This will help to boost the local economy and provide employment opportunities in the region.
The new automobile storage facilities should help Mumbai’s suburban rail network. The increased capacity for railway maintenance and repair will contribute to shorter train maintenance and repair times. This will boost the efficiency of Mumbai’s suburban rail network.
The government’s commitment to upgrade Mumbai’s suburban rail network includes the new vehicle shelters. The government plans to increase train frequency and add more trains in order to meet Mumbai’s expanding demand for suburban rail transit.
Mumbai’s suburban rail system is essential to the survival of the city. Approximately 7.5 million people utilize the suburban rail system daily. Residents of Mumbai will experience better and more efficient suburban train travel as a result of the construction of two new car sheds.
The Metropolitan Region (MMR) of Mumbai recently completed the construction of two car sheds for the upkeep of the city’s suburban rail system. Modern train inspection facilities and sophisticated sensors will be included in the new car sheds, which will shorten the time needed for train maintenance and repair. Locals will be able to find work at the new auto sheds, which will help the region’s economy.