Mumbai Metro Line 5 (Thane-Bhiwandi-Kalyan) metro corridoris 24.9 KM fully elevated and consists of 17 stations connecting Kapurbawdi (Thane) – Bhiwandi – Kalyan.
Metro corridor 5 is a devised transportation strategy to handle the rising population suburbs of Kalyan and Bhiwandi. Presently, the resident of Bhiwandi and other commuters are dependent on road transport, whereas Kalyan commuters rely on the rail network.
Currently, travelling from Bhiwandi and Kalyan to Mumbai through road and rail take more than 2 hours for a person to travel.
Metro Line 5 corridor will significantly reduce the stress on the current transportation system and help the commuters travel quickly and conveniently.
The metro lines will pass through the crowded area of Thane, Bhiwandi and Kalyan so that the metro will be accessible to many commuters easily.
Mumbai Metro Line 5 (Thane - Bhiwandi - Kalyan) Stations
Below is the list of stations on Mumbai Metro Line 1 i.e., Versova – Andheri – Ghatkopar corridor. There are a total of 12 stations on the line, which are fully elevated.
# | Station Name | Status | Type | Connections |
---|---|---|---|---|
1 | Kapurbawdi | Under Construction | Elevated | Interconnect Mumbai Metro Line 4 – Green Line“ |
2 | Balkum Naka | Under Construction | Elevated | |
3 | Kasheli | Under Construction | Elevated | |
4 | Kalher | Under Construction | Elevated | |
5 | Purna | Under Construction | Elevated | |
6 | Anjur Phata | Under Construction | Elevated | Indian Railways |
7 | Dhamankar Naka | Under Construction | Elevated | |
8 | Bhiwandi | Under Construction | Elevated | |
9 | Gopal Nagar | Under Construction | Elevated | |
10 | Temghar | Under Construction | Elevated | |
11 | Rajnouli Village | Under Construction | Elevated | |
12 | Govegaon MIDC | Under Construction | Elevated | |
13 | Kongaon | Under Construction | Elevated | |
14 | Durgadi Fort | Under Construction | Elevated | |
15 | Sahajanand Chowk | Under Construction | Elevated | |
16 | Kalyan Railway station | Under Construction | Elevated | Central line, Indian Railways |
17 | Kalyan APMC | Under Construction | Elevated | Mumbai Metro Line 12 – Orange Line (Proposed) |
Mumbai Metro Line 5 Route Map (Under Construction Line)
Project/Metro Name: Mumbai Metro Line 5 Thane Bhiwandi Kalyan Metro Corridor
Line Number: 5
Official Line Color: Orange
Status: Under Construction
Distance: 24.9KM
Total Stations: 17 Stations
Depot: Four Bungalows (DN Nagar)
Operator: Mumbai Metropolitan Region Development Authority (MMRDA)
Project Started: December 2017
Project Completion:
Estimated Cost: ₹ 6,208 crore
Detailed Project Report (DPR): –
Website: https://mmrda.maharashtra.gov.in/metro-line-5www.reliancemumbaimetro.com
Daily Estimated Ridership: 2.29 lakhs/day by 2021 and 3.34 lakhs/day by 2031.
Metro Timings: –
Metro Fare: –
Track length: 24.9km
Track Type: Elevated for Phase 1. For Phase 2 – 3KM underground plan is proposed and remaining will be Elevated
Metro Type: Rapid Transit
Number of tracks: 2
Operating Speed: 80km/hr (50mph)
Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification: Overhead 25 kV AC