Mumbai Metro Line Line 6 (Swami Samarth Nagar - Vikhroli) Stations
Below is the list of stations on the Mumbai Metro Line 6 (Swami Samarth Nagar – Vikhroli) corridor. There are a total of 13 stations on the line, which are fully elevated.
# | Station Name | Status | Type | Connections |
---|---|---|---|---|
1 | Swami Samarth Nagar | Under Construction | Elevated | – |
2 | Adarsh Nagar | Under Construction | Elevated | Interconnect Mumbai Metro Line 2 – Yellow Line |
3 | Jogeshwari (West) | Under Construction | Elevated | Jogeshwari railway station |
4 | Jogeshwari-Vikhroli Link Road | Under Construction | Elevated | Interconnect Mumbai Metro Line 7 – Red Line |
5 | Shyam Nagar | Under Construction | Elevated | – |
6 | Mahakali Caves | Under Construction | Elevated | – |
7 | SEEPZ Village | Under Construction | Elevated | Interconnect Mumbai Metro Line 3 – Aqua Line |
8 | Saki Vihar Road | Under Construction | Elevated | – |
9 | Rambaug | Under Construction | Elevated | – |
10 | Powai Lake | Under Construction | Elevated | – |
11 | IIT Powai | Under Construction | Elevated | – |
12 | Kanjurmarg (West) | Under Construction | Elevated | Interconnect Mumbai Metro Line 4 – Green Line |
13 | Vikhroli (EEH) | Under Construction | Elevated | – |
Mumbai Metro Line 6 Route Map (Under Construction Line)
Project/Metro Name:Swami Samarth Nagar – Vikhroli
Line Number: 6
Official Line Color: Pink
Status: Under Construction
Distance: 14.47 KM
Total Stations: 13 Stations
Depot: Kanjurmarg
Operator: Mumbai Metropolitan Region Development Authority (MMRDA)
Project Started:
Project Completion: Expected to complete by 2025
Estimated Cost: ₹ 6,672 crore
Detailed Project Report (DPR): View Here
Website: https://mmrda.maharashtra.gov.in/its
Daily Estimated Ridership: 7.69 lakhs/day by 2031
Metro Timings: –
Metro Fare: –
Track length: 14.47 km
Track Type: Elevated (0.98 km) & Underground (2.915 km)
Metro Type: Rapid Transit
Number of tracks: 2
Operating Speed: 80km/hr (50mph)
Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Electrification: Overhead 25 kV AC
Timeline Mumbai Metro - Line 6 (Pink Line)
Timelines Coming Soon